Skip to main content
Latest

Adani's shut unit restarted, Bangladesh to get power by noon

Advertisement
Adani's shut unit restarted, Bangladesh to get power by noon
Adani Power has restarted the second shut unit of the Godda power plant in Jharkhand, India. The unit's shutdown due to a technical fault disrupted power supply to Bangladesh.

The 800 MW capacity unit was successfully started at 5:17 am Bangladesh time on Sunday. The unit is scheduled to be synchronized with the national grid by 11:30 am. After that, power supply to Bangladesh is expected to return to normal by noon.

Advertisement
300*250 Ad-A-P1

Earlier, one of the two units of the Godda plant was shut down due to a technical fault late at night on September 11.

Advertisement
300*250 Ad One-Green
Advertisement
728*90 Ad One-be
Dhaka Magazine Follow our Google News channel for updates
National More from
Prime Minister's Feni visit postponed

Prime Minister's Feni visit postponed

7 minutes ago
No alternative to strong local government for establishing democracy: LGRD Minister

No alternative to strong local government for establishing democracy: LGRD Minister

13 minutes ago
India wants ban on hilsa export from Bangladesh lifted

India wants ban on hilsa export from Bangladesh lifted

1 hour ago
Whether MPO-enlisted teachers can participate in elections, EC to decide

Whether MPO-enlisted teachers can participate in elections, EC to decide

1 hour ago
Prime Minister inspects North City stall on Dengue Prevention Day

Prime Minister inspects North City stall on Dengue Prevention Day

21 hours ago
Prime Minister seeks countrymen's cooperation in dengue prevention

Prime Minister seeks countrymen's cooperation in dengue prevention

1 day ago