Skip to main content
Latest

Urgent message regarding gas supply in Titas area

Advertisement
Urgent message regarding gas supply in Titas area
Due to technical faults at the LNG (Liquefied Natural Gas) terminals located in Maheshkhali, Cox's Bazar, the supply of re-gasified LNG (RLNG) has decreased significantly. As a result, industrial, commercial, CNG and residential customers in vast areas under Titas Gas Transmission and Distribution Company may face severe gas crisis.

Titas Gas Authority informed this information in a notice on Sunday (July 26).

Advertisement
300*250 Ad-A-P1

The notice said that due to technical problems at the LNG terminals in Maheshkhali, the supply of re-gasified LNG to the national grid has decreased by about 450 million cubic feet (MMCFD). As a result, gas pressure has significantly decreased in Titas Gas distribution areas.

Advertisement
300*250 Ad One-Green

Severe low gas pressure may continue in various areas under Titas until the situation improves. In particular, there is a risk of disruption to normal gas usage for industrial factories, commercial establishments, CNG filling stations and residential customers. The authority also warned that gas pressure may decrease further in many areas during peak hours.

Titas Gas has expressed sincere apologies for the temporary inconvenience to customers. At the same time, it has been informed that the concerned organizations are working to quickly resolve the technical fault and normalize the LNG supply. It is hoped that once the supply normalizes, gas pressure will gradually return to its previous state.

Advertisement
728*90 Ad One-Y
Advertisement
728*90 Ad One-be
Dhaka Magazine Follow our Google News channel for updates
National More from
Another 6 deaths from dengue, 1,886 hospitalized

Another 6 deaths from dengue, 1,886 hospitalized

10 hours ago
Measles and symptoms: 7 deaths in 24 hours, 1,315 newly identified

Measles and symptoms: 7 deaths in 24 hours, 1,315 newly identified

10 hours ago
Plane carrying Prime Minister en route to Dhaka after fault repaired

Plane carrying Prime Minister en route to Dhaka after fault repaired

10 hours ago
100% livestock vaccine production must be done in the country: State Minister Tuku

100% livestock vaccine production must be done in the country: State Minister Tuku

10 hours ago
Public Administration Adviser seeks JICA cooperation to strengthen food safety

Public Administration Adviser seeks JICA cooperation to strengthen food safety

13 hours ago
Food Minister stresses building sustainable infrastructure to increase food grain storage capacity

Food Minister stresses building sustainable infrastructure to increase food grain storage capacity

15 hours ago