Skip to main content
Latest

One unit of Adani power plant shut down, load shedding may increase

Advertisement
One unit of Adani power plant shut down, load shedding may increase
After coal supply became normal, while generation was being increased, a unit of Adani's power plant shut down due to a technical fault. As the unit shut down around 12:00 midnight on Thursday (September 10), the plant's generation fell below 750 MW. This has created fears that load shedding may increase further in the country.

Power Development Board (PDB) and Power Grid Company sources said that due to coal supply being disrupted by a storm, the plant's generation had been low since August 7. Toward the end of last month, generation was increased and about 900 MW was being supplied during the day, and up to 1,200 MW from evening until 12 midnight. Although generation exceeded 1,400 MW on Wednesday night, after the unit shut down it fell to less than half.

Advertisement
300*250 Ad-A-P1

This 1,600 MW capacity power plant built in Jharkhand, India, has two units of 800 MW each. In 2017, PDB signed a contract to buy electricity from the plant. There are also records of supplying more than 1,500 MW from it as per demand.

Advertisement
300*250 Ad One-Green

Officials associated with the plant said a unit was shut down after a fault was detected in the boiler. It may take about 48 hours for the boiler to cool down. After that, repair work will start. As a result, it may take several more days for generation to become normal.

PDB sources said that due to the gas crisis for more than two months, gas-based power generation has decreased by up to about 1,500 MW. At the same time, coal-based plants are not generating at full capacity due to coal shortage and technical faults. One unit of the Payra power plant is shut down, and several other plants, including Rampal, have reduced generation due to a coal crisis.

Advertisement
728*90 Ad One-Y

Those concerned said that even by starting extra fuel oil-based plants, the situation cannot be managed. As the heat increases and electricity demand rises, load shedding is also increasing. On Wednesday, the maximum load shedding was 3,557 MW. On Friday, a holiday, even in the morning, there was more than 2,500 MW of load shedding across the country.

Advertisement
728*90 Ad One-P
Advertisement
728*90 Ad One-be
Dhaka Magazine Follow our Google News channel for updates
National More from
Allegations of Tk 120 crore transactions in Public Works transfers; concern over appointment of Awami League loyalists to key installations

Allegations of Tk 120 crore transactions in Public Works transfers; concern over appointment of Awami League loyalists to key installations

7 hours ago
Status on meeting with Tareque Rahman, Japan’s strong support for Bangladesh

Status on meeting with Tareque Rahman, Japan’s strong support for Bangladesh

7 hours ago
Government aims to create 1 million jobs in digital sector: ICT Minister

Government aims to create 1 million jobs in digital sector: ICT Minister

7 hours ago
Japan to provide patrol ship to Coast Guard, agreement on maritime security

Japan to provide patrol ship to Coast Guard, agreement on maritime security

7 hours ago
11 more die of dengue, 2,071 hospitalized in a day

11 more die of dengue, 2,071 hospitalized in a day

8 hours ago
Another 7 children die of measles and symptoms in the country; total death toll 1,240

Another 7 children die of measles and symptoms in the country; total death toll 1,240

8 hours ago