Today at noon, after a review meeting of the Greater Jashore District Waterlogging Elimination and Irrigation Area Development Project in the Jashore Collectorate conference room, he said this while briefing journalists.
The minister said the work of the ongoing 81-kilometer river excavation project to resolve waterlogging will be completed by next June. In addition, there are plans to excavate a new canal in Amdanga and excavate about another 90 kilometers of river while keeping the water flow of the Shibsa River normal. These works are expected to be completed within the current and next fiscal years.
He said the canal excavation program of the Ministry of Water Resources through the Water Development Board is part of the promise made before the election. The ongoing 81-kilometer and additional 45-kilometer excavation work became visible in the last fiscal year. As a result, the people of the area have received some benefit. The Prime Minister is also informed about the matter and has given necessary instructions.
Earlier, the project review meeting, held from 10 am to 12:30 pm, was chaired by State Minister for Power, Energy and Mineral Resources Anindya Islam Amit.
Water Resources Minister Shahiduddin Chowdhury Annie, Minister of Agriculture, Fisheries and Livestock Mohammad Amin Ur Rashid, Law Minister Md. Asaduzzaman, and Secretary of the Cabinet Division Nasimul Gani were present at the meeting.
At the meeting, various aspects of the project regarding resolving waterlogging, optimal use of agricultural land, and expansion of irrigation facilities were highlighted. However, local representatives demanded keeping rivers and canals active instead of irrigation projects, introducing tidal flow or TRM in the beels, and taking separate plans considering local realities.




